1. METHOD OF CONSTRUCTION: Driving of Steel Tubes
  2. SCOPE OF WORK:
    2.1 - Pile Driving: 2500.00m (approximately)
  3. NOTES: In this project 193 number of steel tubes of 142cm dia. and up to 48m long were being lifted and driven offshore in to the sea bed as deep as approximately 20m. Our driving tools used in this project, are a heavy-duty hydraulic vibro hammer and Delmag diesel pile driver (type D100-13) both operating from a floating barge.