1. METHOD OF CONSTRUCTION: Soldier Piles as Quay Wall, Access Road and Break Water.
  2. SCOPE OF WORK:
    2.1 - Earth Works: 484,636.00m 3 (Core, Filter and Armor Stone Material)
    2.2 - Concreting: 3,443.00m3
    2.3 - Steel Bars 886.00 Tons
    2.4 - Formwork: 3,472.00m2
    2.5 - Drilling: 7,589.00m
  3. NOTES: Construction of 769 number of cast in situ concrete piles of 60 cm diameter. Driving of steel casing of 60cm diameter as deep as 12m to remain in place and also construction of the pile caps and deck.
 