1. METHOD OF CONSTRUCTION: Pile and Deck, Quay Wall, Soldier Piles
  2. SCOPE OF WORK:
    2.1 - Earth Works: 204,360.00m3
    2.2 - Concreting: 53,330.00m3
    2.3 - Steel Bars 4,490.00 Tons
    2.4 - Formwork: 38,372.00m2
    2.5 - Drilling: 10,416.00m 3.
  3. NOTES: Construction of 456 number of cast in situ concrete piles of 150cm diameter. Driving of steel casing of 150cm diameter as deep as 16m were required in order, to prevent the collapse of the drilled hole. Immediately the steel pipes were pulled out using heavy-duty vibro hammer. Construction of the reinforced concrete deck, installation of the bollards and fenders.

PARHAM CONSTRUCTION CO.
No. 31 Varshow St., Nejatollahi Avenue,
Tehran 15986, Iran Tel. (0098 21)-890-1799, 890-3389, 890-0669,
Fax (0098 21)-890-5378
E-mail: info@parhamco.com, parham@neda.net.ir